Foundation Design and Construction

The following works are general treatments of this topic. For more detailed information, look at the topics to the right. We also have information on the following subjects:

Foundations

NAVFAC DM 7.02 or DM 7.2
1 September 1986

This document is back in print; click here for information on how to order

navfac-dm-7-2-cover

Considered by many to be the best reference series on soil mechanics and foundations, although somewhat dated now. Published by the Naval Facilities Engineering Command (NAVFAC) in Norfolk, Virginia.  The history and subsequent course of this document is complicated; click here to look at that, with links to many related documents.

  • EXCAVATIONS
    • Open Cuts
    • Trenching
    • Braced Excavations
    • Rock Excavation
    • Groundwater Control
    • Excavation Stabilization, Monitoring, and Safety
  • COMPACTION, EARTHWORK, AND HYDRAULIC FILLS
    • Embankment Cross-Section Design
    • Compaction Requirements and Procedures
    • Embankment Compaction Control
    • Borrow Excavation
    • Hydraulic and Underwater Fills
  • ANALYSIS OF WALLS AND RETAINING STRUCTURES
    • Computation of Wall Pressures
    • Rigid Retaining Walls
    • Design of Flexible Walls
    • Cofferdams
  • SHALLOW FOUNDATIONS
    • Bearing Capacity
    • Spread Footing Design Considerations
    • Mat and Continuous Beam Foundations
    • Foundations on Engineered Fill
    • Foundations on Expansive Soils
    • Foundation Waterproofing
    • Uplift Resistance
  • DEEP FOUNDATIONS
    • Foundation Types and Design Criteria
    • Bearing Capacity and Settlement
    • Pile Installation and Load Tests
    • Distribution of Loads on Pile Groups
    • Deep Foundations on Rock
    • Lateral Load Capacity

Basics of Foundation Design

Bengt Fellenius
February 2014

This book, written by one of the acknowledged greats of geotechnical engineering, presents a background to conventional foundation analysis and design. The text concentrates on the static design for stationary foundation conditions, and intends to present most of the basic material needed for a practising engineer involved in routine geotechnical design. It emphasises two main aspects of geotechnical analysis, the use of effective stress analysis and the understanding that the vertical distribution of pore pressures in the field is fundamental to the relevance of any foundation design. Additionally the text covers cone penetration testing, settlement of foundations, vertical drains, earth stress, bearing capacity of shallow foundations, static analysis of pile load transfer and analysis of the static load test, pile dynamics, and piling terminology. Also included are worked examples and specifications and dispute avoidance.


California Foundation Manual

Caltrans Office of Structure Construction
July 1997

The Foundation Manual is intended to provide the field engineer with information that may be of some assistance in solving foundation problems and in making engineering decisions.

Although the field engineer is required to make engineering decisions throughout the life of a construction project, none is probably more important than the engineer’s decision regarding the suitability or unsuitability of the foundation material supporting a spread footing foundation. The engineer must decide if the foundation material encountered at the planned bottom of footing elevation is, in fact, representative of the material shown on the Log of Test Borings sheet and therefore suitable for the imposed loads. If not representative, the engineer must decide what action to take.

This is not to minimize the importance of pile supported foundations, which have their own unique problems that require decisions based on sound engineering judgement. What action does the engineer take when pile bearing capacity is not obtained at specified tip or reaches “refusal” ten feet above tip elevation?

All types of foundations are discussed in the manual along with related problems and possible solutions. There is no one solution that will always solve a particular problem. Each situation must be reviewed and a decision made based on the available data and one’s own experience.

There is no substitute for utilizing sound engineering judgement in solving engineering problems. If all problems are solved in this manner, then the engineer can be confident that a good solution was used to solve the problem.

Deep Foundations

UFC 3-220-01A
16 January 2004

This is another one of those documents with a “complicated” history.  The original document was EI02C097, which was issued in 1996.  The webmaster was involved in the effort that resulted in this document.  It is an excellent overview of the topic, although now a little dated.  Probably due to word processing software compatibility issues, this version of the document–nearly eight years after the original–mangles the equations.  For a scan of the original paper document, you can find that here, and it is preferable to this one.

This publication presents data, principles and method for use in planning, design and construction of deep foundations. Deep foundations are literally braced (supported) column elements transmitting structure loads down to the subgrade supporting medium.

General Information with respect to the selection and design of deep foundations is addressed herein. Single and groups of driven piles and drilled shafts under axial and lateral static loads are treated. Some example problems and the most widely accepted computer methods are introduced.

Design, Analysis, and Testing of Laterally Loaded Deep Foundations that Support Transportation Facilities

Geotechnical Engineering Circular #9
James Parkes, P.E., Raymond Castelli, P.E., Brian Zelenko, P.E., Robert O’Connor, P.E., Matteo Montesi, P.E, and Elizabeth Godfrey, P.E.
Federal Highway Administration FHWA-HIF-18-031
April 2018

This Geotechnical Engineering Circular (GEC) is intended to provide recommended guidance for the LRFD design, analysis, and testing of laterally loaded deep foundations for transportation facilities. This document applies to deep foundation elements such as driven piles, drilled shafts, micropiles, and continuous flight auger (CFA) piles that are used to resist lateral loads, often in combination with axial loads, for new construction, rehabilitation, or reconstruction of transportation facilities. Applications include both single and groups of deep foundation elements for bridge foundations, excavation support, earth retention structures, noise walls, sign and signal foundations, landslide repairs, vessel or vehicle impact mitigation measures, and seismic event resistance. The objective of this document is to provide a single reference source for the state-of-the-practice with regard to recommended methodologies and guidance for the design, analysis, and testing of laterally loaded deep foundations for transportation facilities.

Determination of Unknown Subsurface Bridge Foundations

Larry D. Olson, Farrokh Jalinoos, and Marwan F. Aouad
Geotechnical Guideline No. 16
August 1998

Purpose: To provide interim information on available NDT methods for assessing unknown bridge foundations.

Background: The NCHRP Project 21-5 involves a study of various types of NDT equipment which could be used in subsurface investigation of unknown bridge foundations. At this stage of the research, the general aspects of several types of NDT equipment have been assessed for applicability in the unknown bridge foundation area. Although no definite conclusions can yet be reached on the reliability of these NDT methods in all situations, enough data has been collected to provide interim information to highway agencies on the general aspects of these methods.

Continuing Research: Based on the results of this report, a second phase of research was initiated. The phase II research will evaluate the validity and accuracy of some of the NDT methods researched during Phase I and to develop instrumentation for use by highway departments and agencies. The initial phase of the Phase II research was to determine the feasibility of adapting/developing practical methods and equipment for the determination of subsurface bridge foundation characteristics, particularly the depths of the foundations. The next part of the research involved semi-blind NDT studies of 20 bridges with known foundations to determine the accuracy of the methods. The final report presenting the research results is expected in the Spring of 1999.

ELPLA

Click on the title above to download

ELPLA (ELASTIC PLATE) is a program for analysing raft foundations of arbitrary shape with the real subsoil model. The mathematical solution of the raft is based on the finite element method. The program can analyse different types of subsoil models, especially the three-dimensional Continuum model that considers any number of irregular layers. A good advantage of this program is the capability to handle the three analyses of flexible, elastic and rigid foundations. In addition, the mesh of the rigid and flexible foundations can be constructed to be analogous to the finite elements mesh of the elastic foundation. Therefore, the three analyses can be compared easily and correctly. ELPLA can also be used to represent the effect of external loads, neighbouring foundations, tunnelling and the influence of the temperature difference on the raft.ELPLA is a 32-bit, graphical software product that operates under Microsoft Windows 95 and Windows NT. The common “what you see is what you get” of Windows applications makes it easy to learn how to use ELPLA, especially if you are already familiar with the Windows environment.

Foundation Engineering: In-the-Wet Design and Construction of Civil Works Projects

ETL 1110-2-565
30 Sep 2006

Constructing foundations in-the-wet has always presented challenges, uncertainties, and risks. Nevertheless, working in-the-wet presents not only difficulties, but also unique opportunities. Man has been dealing with both these difficulties and opportunities to install structural foundations in-the-wet since prehistoric times, and each new advance in foundation technology has resulted in the construction of ever more demanding foundations built in-the-wet, while keeping the level of risk at, or below, the threshold of acceptance for each new era of building.

In recent times engineers are minimizing risks: of delays, of cost over-runs, of claims, and of not being prepared to deal with changed subsurface conditions, by using advanced construction equipment and techniques, by minimizing the use of personnel, and by maximizing the use of prefabrication. Availability of large floating equipment has encouraged modern in-the-wet engineers to use large driven piles and drilled shafts (often socketed into rock). Indeed, offshore equipment has been used to install large diameter steel, concrete, and composite cylinder piles for major foundations in deep water and in difficult soils, safely, rapidly, and economically.

The challenge facing the modern engineer designing in-the-wet foundations is to minimize uncertainties by adequate investigation, and to minimize the risk, and the consequence of potential failures, by establishing criteria that result in redundant, flexible, and adjustable foundation designs that have benefited from the lessons learned from the past. This document is provided to assist the modern engineer in carrying on the tradition of past marine foundation success, to overcome the many challenges of in-the-wet foundation construction.

Foundation Reuse for Highway Bridges

Agrawal, A.K., Jalinoos, F., Davis, N., Hoomaan, E., and Sanayei, M.
City College of New York
Federal Highway Administration FHWA-HIF-18-055
November 2018

Foundations of existing highways and over-river bridges may have significant functional value. Hence, reuse of foundations of existing bridges during reconstruction or major rehabilitation can result in significant savings in costs and time. This report on bridge foundation reuse addresses critical issues encountered during decision-making on foundation reuse, assessment of existing bridge foundations for integrity, durability and capacity, strengthening of bridge foundations / substructures and design of bridge foundations for future reuse. The report includes numerous case examples on reuse of bridge foundations in the U.S. and Canada to highlight significant benefits of foundation reuse from social, environmental and economic perspectives. These case examples also
present a detailed process followed in resolving integrity, durability and capacity issues encountered during the reuse process, and will serve as a knowledge base for transportation agencies interested in reusing bridge foundations. Planning for reuse during the construction of a new bridge is a very important sustainability initiative that has also been addressed in this manual. This document is not meant to be used as a guideline; only as decision-making tool in addressing technical challenges and risk in reusing bridge foundations.

Geotechnical Engineering Procedures for Foundation Design of Buildings and Structures

Unified Facilities Criteria UFC 3-220-01N
15 August 2005

Replaces NAVFAC DM 7.02, available above.

This UFC presents guidance for selecting and designing foundations for buildings and facilities of all types and associated features for buildings such as earth embankments and slopes, retaining structures, and machinery foundations. Foundations for hydraulic structures are not included; however, foundations design methods for piers, wharves and waterfront structures are covered. Foundation design differs considerably from design of other elements of a structure because of the interaction between the structure and the supporting medium (soil and rock). The soil and rock medium are highly variable as compared to steel and concrete products above the soil; therefore, much attention is given to presenting subsurface investigation methods to better determine the properties of the soil and rock. The seismic aspects of foundation design are presented in detail.

Design: General Building Requirements

UFC 1-200-01
31 July 2002

This UFC provides guidance for the use of model building codes for design and construction of Department of Defense (DOD) facilities. A special feature of this document is the extensive information on wind and seismic loading, which can be otherwise difficult to locate.

Grouting Methods and Equipment

UFC 3-220-06
16 January 2004

This manual was prepared to provide guidance in the use of pressure grouting as a means to correct existing or anticipated subsurface problems. Information on procedures, materials, and equipment for use in planning and executing a grouting project i’s included, and types of problems that might be solved by pressure grouting are discussed. Methods of pressure grouting that have proven to be effective are described, and various types of grouts and their properties are listed.

Load Testing Handbook (including Pile Testing Datasheets)

Federation of Piling Specialists
February 2006

This handbook provides guidance on the principles and practical issues that relate to load testing of bearing piles, and thereby to assist informed decisions about testing requirements on construction projects involving piled foundations. This handbook will be of particular interest to civil or structural engineers with little or no experience of piling who find themselves in the position of specifying load testing requirements on a project involving piled foundations. The target audience for this publication also includes main contractors, management contractors and young piling engineers.

The document includes pile testing datasheets, which include the following:

  1. Guidance for the Principal Contractor
  2. Pile testing – interpretation
  3. Training programme for pile testing technicians
  4. The purpose of the pile load test
  5. Pile load testing – what each type of test should realistically achieve
  6. Pile load testing – basic information to be provided to the Testing Contractor
  7. Pile load testing – test cap
  8. Pile load testing – working platform
  9. Pile load testing – lone working
  10. Pile integrity testing – a good practice guide
  11. Pile integrity testing – basic information to be provided to the Testing Contractor
  12. Pile integrity testing – why it is important to allow enough time between pile testing and pile cap construction
  13. Pile integrity testing – terminology
  14. Pile integrity testing using Cross Hole Sonic Logging
  15. Pile testing – safety

Prefabricated Vertical Drains

Note: we have an entire page devoted to Vertical Drains: Sand and Wick, where this document can be accessed.

FHWA/RD-86/168
August 1986

This volume presents procedures and guidelines applicable to the design and installation of prefabricated vertical drains to accelerate consolidation of soils. The volume is intended to provide assistance to engineers in determining the applicability of PV drains to a given project and in the design of PV drain systems. The information contained herein is intended for use by civil engineers familiar with the fundamentals of soil mechanics and the principles of pre-compression.

The volume includes descriptions of types and physical characteristics of PV drains, discussion of design considerations, recommended design procedures, guideline specifications and comments pertaining to installation guidelines, construction control, and performance evaluation.

Protocols for the Assessment and Repair of Bridge Foundations Final Report

Robert O’Connor, P.E., John Wisniewski, P.E., Brian Zelenko, P.E., James Parkes, P.E., Ray Castelli, P.E.
FHWA-HIF-17-044
August 2016

This report is intended to provide guidance to bridge owners for preparing for and responding to bridge foundation failures. The word “failure” as used herein includes foundation movements and/or corrosion beyond the design norms for the structure that result in the need to close a bridge or portion thereof for any period of time. The movements and/or corrosion may or may not cause the bridge to be unsafe, but are considered significant enough to close the bridge. The catastrophic failure or collapse of a main load carrying member of the bridge is not included in this definition. A catastrophic failure would result in the need to replace the entire bridge or at least the failed portion. This report focuses on restoring the load carrying capacity of the failed foundation so that the bridge can be put back into service. The report describes case histories of recent bridge foundation failures. This report provides guidance on preparing for foundation events by collecting records, establishing response teams and developing notification and communication protocols. Once an event has occurred, the report provides guidance for response including closing the bridge to traffic, notifying government and private parties, stabilizing the bridge site, investigative and monitoring techniques, repair and retrofit techniques. The report includes a check list intended to assist bridge in preparing for an incident and for developing a response once an incident has occurred.

Settlement Analysis

EM 1110-1-1904
30 September 1990

Bonus: We also have the program VDISPL, a Windows implementation of the vertical displacement program shown in the manual.

This manual presents guidelines for calculation of vertical displacements and settlement of soil under shallow foundations (mats and footings) supporting various types of structures and under embankments. It is one of the more comprehensive treatments of the subject, detailing procedures such as Schmertmann’s method for settlement on cohesionless soils, Terzaghi consolidation theory and time rate of settlement for cohesive soils, a raft of “simplified” and alternative methods, and discussion of elastic theory as applied to foundations (Boussinesq theory.)

Tolerable Movement Criteria for Highway Bridges

We also feature the preliminary interim document for this, FHWA/RD-81/162, here.

Lyle K. Moulton, Hota V. S. GangaRao, and Grant T. Halvorsen
FHWA-RD-85-107
October 1985

This investigation included:

  1. a state-of-the-art assessment of tolerable bridge movements based on a literature review, an appraisal of existing design specifications and practice, the collection and analysis of field data on foundation movements, structural damage and the tolerance to movements for a large number of bridges (314) in the United States and Canada, and an appraisal of the reliability of the methods currently used for settlement prediction;
  2. a series of analytical studies to evaluate the effect of different magnitude and rates of differential movement on the potential level of distress produced in a wide variety of steel and concrete bridge structures of different span lengths and stiffnesses; and
  3. the development of a methodology for the design of bridges and their foundations that embodies a rational set of criteria for tolerable bridge movements.

Underwater Geotechnical Foundations

Landris T. Lee, Jr., Richard W. Peterson
Geotechnical and Structures Laboratory
U.S. Army Engineer Research and Development Center
ERDC/GSL TR-01-24
(TR-INP-01-1)
December 2001

The purpose of this report is to provide an overview of underwater geotechnical foundation design and construction and preliminary guidance based on past and current technology applications. Most of the state-of-the-art technology comes from the marine offshore industry, because of its complex foundation engineering challenges in the deep-ocean frontier. Direct applications may or may not be made to underwater foundations based in shallower rivers and inland waterways, but most of the principles, techniques, and equipment are related.

3 thoughts on “Foundation Design and Construction

  1. Hi,
    Wow Very Nice blog post! Your site has given the best information from your articles they are amazing and useful to all people. Thank you For sharing This Post and impressive site. NVLN CONSTRUCTIONS PVT LTD is a provider of end to end building Restoration services to help clients to improve safety and longevity of structures. We have been relentlessly working on providing services in concrete repairs & rehabilitation works.

    Like

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.